Phil,
Congratulations, and thank you for sticking with this. Getting turned back in the summer and coming back with a stronger proposal says a lot about the effort you put in. Thanks also for the kind words. It’s been a lot of fun working on this alongside you, Matthew, and everyone else who has been testing, mapping, and offering sites.
I think the decision to keep all the grant-funded infrastructure strictly Part 97 is the right one. It gives us a clean backbone to build on, and it makes the educational side easier because we can show both environments side by side and explain why they’re configured differently.
If any of this would be useful, I’d be glad to pitch in wherever it helps:
- Coverage planning. I’ll add the confirmed grant sites to the coverage map as soon as we have locations and mounting heights, so we can model coverage and overlap before anything goes up the pole. Once nodes are installed, we can compare predicted coverage to real-world results and adjust.
- Configuration standards. It would help to agree on a standard setup for the backbone nodes before we start installing them: licensed-operator mode, callsign naming convention, role, modem preset, hop limit, and MQTT settings. That way every site behaves the same and troubleshooting is easier. I’m happy to draft a first pass for the group to review.
- Educational materials. I’ve been working on a write-up explaining MQTT and Meshtastic’s zero-hop rule, which seems like a natural fit for the educational library. I can also help with pieces on site selection, antenna height, and Part 15 vs. Part 97 setup as we learn from the installs.
- Installs and testing. Count me in for installation days and drive testing.
Your point about the 501(c)(3) status is well taken, too. It’s easy to overlook that kind of groundwork until it turns out to be the thing that makes an opportunity possible.
Now let’s go build something!
73,
Chris KI5HSQ